Disposal of construction waste in Moscow
Disposal of construction waste is one of the most important stages of construction and repair works, which involves the disposal of bulky and specific contaminants left from the use of construction materials and dismantling for subsequent disposal.
The construction waste includes the following:
- Fragments of dismantled engineering communications;
- Brick rubble, parts of floors and concrete crumb;
- Wooden structures (window frames, doors and boxes, built-in cabinets, etc.);
- Finishing materials, including polymers;
- Fine dust from building materials, top layer of ground contaminated with cement, whitewash, paint and other substances.
Cost of services for disposal of construction waste.
The price is calculated on the basis of the information that the customer provides when submitting the application, namely: volume and composition of waste, distance from the site of disposal, number of hauls to be made, time limits and other aspects.
You can download pricelist (.xls 25 kB) or download Disposal of construction waste contract (.doc 254 kB)
Volume | South | South East | East | Center | South West | West | North East | North | North West |
8 м3 | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. | 10000 Rub. |
20 м3 | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. | 22000 Rub. |
27 м3 | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. | 27000 Rub. |
40 м3 | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. | 40000 Rub. |
The indicated rates are approximate. The final cost can be adjusted depending on the additional conditions.
To Order
Call +7(495) 504-14-91
Equipment for garbage disposal
The removal of construction debris is carried out with the help of special containers, which make it possible to safely and quickly clean the site. The variety of equipment intended for this purpose is designed to provide maxi
The order of the organization of export of construction garbage in Moscow
In accordance with the current legislation, the removal of construction and repair waste is just as compulsory as the development of the project, technical supervision and reconciliation of the redevelopment. Therefore, the company Eco Service, offering the most favorable terms of cooperation, adheres to a strictly regulated procedure for the export of construction debris, namely:
- Containers always correspond to the composition and volume of waste;
- Each service, whether it is the maintenance of the enterprise on a permanent basis, the lease of containers or a one-time service, is documented;
- Large-sized rubbage of a specific composition is exported directly to the site of its utilization;
- The schedule of waste transportation is established and observed.
In addition, Eco Service provides services around the clock, ensuring a high level of service.